PREPARATION FOR CASTING THE 2ND FLOOR OF THE IRC VOLUME 100M3
PREPARATION FOR CASTING COLUMNS ON THE 2ND FLOOR OF THE IRC BUILDING, ZONE 1
CASTING OF COLUMNS ON THE 2ND FLOOR OF THE IRC BUILDING
PROGRESS OF REINFORCEMENT OF THE 2ND FLOOR SLAB OF THE IRC BUILDING
PROGRESS OF REINFORCEMENT OF THE 2ND FLOOR SLAB OF THE IRC BUILDING
WORK ON THE 3RD FLOOR OF THE IRC
PREPARATION FOR CASTING THE 2ND FLOOR OF ZONE 2 OF THE IRC BUILDING
THE REMAINING 1 TM OF THE TOTAL 127 M³ OF CASTING OF FLOOR SLABS AND BEAMS OF THE 02ND FLOOR OF THE IRC BUILDING
FINISHING OF CASTING OF FLOOR SLABS AND GRID BEAMS CDEF IRC BUILDING 02ND FLOOR.
CASTING OF COLUMNS OF IRC BUILDING, 2ND FLOOR, ZONE 2
PROGRESS OF WORK ON REINFORCING FLOOR SLABS AND BEAMS OF THE IRC BUILDING, 2ND FLOOR, ZONE 3
CHECKLIST P2H READY FOR CASTING TONIGHT 43 M3
PROGRESS OF INSTALLATION OF FORMWORK FOR FLOOR SLABS AND BEAMS OF IRC BUILDING, FLOOR 3 ZONE 1
CHECK THE VERTICALITY OF THE IRC COLUMN, FLOOR 2, ZONE 3
IRC COLUMN CASTING PACK 2ND FLOOR (ZONE 3)
CONTINUED CASTING OF FLOOR SLAB 02 IRC