HETI PIU RSPTN – IRC Unila

piu.rsptn@kpa.unila.ac.id

RSPTN WORK PROGRESS (PHOTO) WEEK 37

PREPARATION FOR CASTING THE RSPTN BASEMENT FLOOR ELEVATIONPREPARATION FOR CASTING THE RSPTN BASEMENT FLOOR ELEVATIONCP PUMP SETTING PROCESS FOR BASEMENT FLOOR AREA RSPTNCP PUMP SETTING PROCESS FOR BASEMENT FLOOR AREA RSPTNRSPTN BASEMENT FLOOR CASTING WORK ( 70 M3 ) K225RSPTN BASEMENT FLOOR CASTING WORK ( 70 M3 ) K225PLASTERING WORK IN THE AREA OF ​​RSPTN LT.01 GRID 1A-1HPLASTERING WORK IN THE AREA OF ​​RSPTN LT.01 GRID 1A-1HPLASTERING WORK IN THE AREA OF ​​RSPTN LT.01 GRID 1A-1HPLASTERING WORK IN THE AREA OF ​​RSPTN LT.01 GRID 1A-1HCONTINUE CASTING THE FLOOR ELEVATION. BASEMENT RSPTNCONTINUE CASTING THE FLOOR ELEVATION. BASEMENT RSPTNCONTINUE CASTING THE FLOOR ELEVATION. BASEMENT RSPTNCONTINUE CASTING THE FLOOR ELEVATION. BASEMENT RSPTNPROGRESS OF SLAB AND BEAM REINFORCEMENT WORK ON 4TH FLOOR RSPTN ZONE 4 APROGRESS OF SLAB AND BEAM REINFORCEMENT WORK ON 4TH FLOOR RSPTN ZONE 4 APROGRESS OF RSPTN TOP FLOOR SCAFFOLDINGPROGRESS OF RSPTN TOP FLOOR SCAFFOLDINGCASTING WORK SW 1 AND COLUMN AXLE D4 RSPTN ( 13 M3 ) K400CASTING WORK SW 1 AND COLUMN AXLE D4 RSPTN ( 13 M3 ) K400CASTING WORK SW 1 AND COLUMN AXLE D4 RSPTN ( 13 M3 ) K400CASTING WORK SW 1 AND COLUMN AXLE D4 RSPTN ( 13 M3 ) K400SETTING UP THE RSPTN STAIR FORMWORK (FLOOR 3-5) CHECK DIMENSIONS AND REPAIRINGSETTING UP THE RSPTN STAIR FORMWORK (FLOOR 3-5) CHECK DIMENSIONS AND REPAIRINGSETTING FORMWORK FOR SW 5 RSPTN STAIRS (FLOORS 3 - 4) CHECK DIMENSIONS AND REPAIRINGSETTING FORMWORK FOR SW 5 RSPTN STAIRS (FLOORS 3 – 4) CHECK DIMENSIONS AND REPAIRINGPROGRESS OF SLAB AND BEAM REINFORCEMENT WORK ON 4TH FLOOR RSPTN ( ZONE 4 A)PROGRESS OF SLAB AND BEAM REINFORCEMENT WORK ON 4TH FLOOR RSPTN ( ZONE 4 A)SETTING UP THE FORMWORK FOR THE RSPTN RAMP COLUMNS, FLOORS 2-3 (CHECK THE REINFORCEMENT AND DIMENSIONSSETTING UP THE FORMWORK FOR THE RSPTN RAMP COLUMNS, FLOORS 2-3 (CHECK THE REINFORCEMENT AND DIMENSIONSPREPARATION FOR CASTING SLABS AND BEAMS FLOOR 4 RSPTN ZONE 4 A (K400) CHECK CLEANLINESS, DIMENSIONS, AND REPAIRPREPARATION FOR CASTING SLABS AND BEAMS FLOOR 4 RSPTN ZONE 4 A (K400) CHECK CLEANLINESS, DIMENSIONS, AND REPAIRSW 2 RSPTN REINFORCEMENT WORK (CHECK DIMENSIONS AND REINFORCEMENTSW 2 RSPTN REINFORCEMENT WORK (CHECK DIMENSIONS AND REINFORCEMENTCHECK THE DIMENSIONS AND FIXINGS OF RSPTN ZONE 4B STAIRS (FLOOR 1-2)CHECK THE DIMENSIONS AND FIXINGS OF RSPTN ZONE 4B STAIRS (FLOOR 1-2)SLAB AND BEAM CASTING WORK ON FLOOR 4 RSPTN ZONE 4A (K400)SLAB AND BEAM CASTING WORK ON FLOOR 4 RSPTN ZONE 4A (K400)COMPRESSION TEST K400 CONCRETE (9 DAYS AND 28 DAYS) 2 SAMPLES + 6 SAMPLESCOMPRESSION TEST K400 CONCRETE (9 DAYS AND 28 DAYS) 2 SAMPLES + 6 SAMPLESBASEMENT FLOOR CASTING WORK RSPTN 80 M3 ( K225 )BASEMENT FLOOR CASTING WORK RSPTN 80 M3 ( K225 )CHECK THE VERTICALITY OF THE 04TH FLOOR COLUMNCHECK THE VERTICALITY OF THE 04TH FLOOR COLUMNSHEAR WALL CASTING (SW5) RSPTN FLOOR ROOFSHEAR WALL CASTING (SW5) RSPTN FLOOR ROOFWORK TO REPAIR RSPTN RAMPS LT 2-3WORK TO REPAIR RSPTN RAMPS LT 2-3CURING FLOOR 4 RSPTN (ZONE 4 A)CURING FLOOR 4 RSPTN (ZONE 4 A)ROOF TOP FLOOR SLAB AND BEAM REINFORCEMENT WORK ELV+24,900 ( ZONE 2 )ROOF TOP FLOOR SLAB AND BEAM REINFORCEMENT WORK ELV+24,900 ( ZONE 2 )COLUMN CASTING WORK ON 4TH FLOOR RSPTN ZONE 4A ( 4 UNITS ) K400COLUMN CASTING WORK ON 4TH FLOOR RSPTN ZONE 4A ( 4 UNITS ) K400PROGRESS OF REFILLING RSPTN RAM 2-3PROGRESS OF REFILLING RSPTN RAM 2-3ROOF FLOOR PLATE CASTING, RSPTN ELV BUILDING. +24.9ROOF FLOOR PLATE CASTING, RSPTN ELV BUILDING. +24.9INSTALLATION OF WF STEEL ANCHORS ON COLUMN TOPS ON FLOOR 4 RSPTN ZONE 4 AINSTALLATION OF WF STEEL ANCHORS ON COLUMN TOPS ON FLOOR 4 RSPTN ZONE 4 AFORMWORK SETTING SW 1 TOP RSPTNFORMWORK SETTING SW 1 TOP RSPTNPROGRESS OF IRC MAIN STAIRS, FLOORS 1-2 (CHECK DIMENSIONS AND REINFORCEMENTSPROGRESS OF IRC MAIN STAIRS, FLOORS 1-2 (CHECK DIMENSIONS AND REINFORCEMENTSCASTING OF FLOOR RAMPS 2 - 3 RSPTNCASTING OF FLOOR RAMPS 2 – 3 RSPTNCHECK THE VERTICALITY OF THE SW 2 FLOOR 3 RSPTN FORMWORKCHECK THE VERTICALITY OF THE SW 2 FLOOR 3 RSPTN FORMWORKSW 2 FLOOR 3 RSPTN CASTING WORKSW 2 FLOOR 3 RSPTN CASTING WORKPLASTERING WORK IN THE AREA OF ​​RSPTN LT.01 GRID 1A-1HPLASTERING WORK IN THE AREA OF ​​RSPTN LT.01 GRID 1A-1H

More from the blog

Perempuan Dominan dalam Pelatihan GAP RSPTN di Unila

Selain memastikan infrastruktur kampus inklusif, Universitas Lampung (Unila) juga menaruh perhatian besar pada penguatan kapasitas sumber daya manusia pada proyek pembangunan Rumah Sakit Pendidikan...

Unila Mantapkan RSPTN Jadi Sentra Pendidikan Kesehatan Lampung

(Unila): Rektor Universitas Lampung (Unila) Prof. Dr. Ir. Lusmeilia Afriani, D.E.A., IPM., ASEAN Eng., menegaskan, Rumah Sakit Perguruan Tinggi Negeri (RSPTN) Unila ditargetkan menjadi...

Unila Gelar Workshop Pengelolaan RSPTN dan Pengembangan Sumber Daya Universitas

(Unila): Universitas Lampung (Unila) gelar Workshop Pengelolaan RSPTN dan Pengembangan Sumber Daya Unila, pada Senin, 20 Oktober 2025. Kegiatan berlangsung pukul 11.00 wib di...

Menko Infrastruktur dan Gubernur Lampung Tinjau Progres Pembangunan RSPTN dan IRC Unila

(Unila): Rektor Universitas Lampung (Unila) Prof. Dr. Ir. Lusmeilia Afriani, D.E.A., IPM., ASEAN Eng., didampingi jajaran pimpinan universitas, menerima kunjungan Menteri Koordinator Bidang Infrastruktur...
EnglishIndonesianJapanese