PREPARATION FOR CASTING THE RSPTN BASEMENT FLOOR ELEVATIONCP PUMP SETTING PROCESS FOR BASEMENT FLOOR AREA RSPTNRSPTN BASEMENT FLOOR CASTING WORK ( 70 M3 ) K225PLASTERING WORK IN THE...
DRILLING OF BORE PILES IN RSPTN BUILDINGSTEEL TIE BEAMS FOR THE RSPTN BUILDINGINSTALLATION OF CONNECTING BEAM REINFORCEMENT FOR THE BASEMENT OF THE RSPTN BUILDINGEXCAVATION...
RSPTN COLUMN REINFORCEMENT WORKPILE CAP WORK FLOOR WORKEXCAVATION WORK FOR FILLING THE RSPTN AREACLOSING OF RETAINING WALL BASEMENT CONNECTING FORMWORKRSPTN PILE CAP CASTINGLIFT AREA...
INSTALLATION OF TIEBEAM FORMWORK FOR RSPTN BUILDINGCOLUMN REINFORCEMENT OF RSPTN BUILDINGINSTALLATION OF PILE CAP FORMWORK FOR RSPTN BUILDINGINSTALLATION OF COLUMN FORMWORK FOR RSPTN BUILDINGEXCAVATION...