RSPTN COLUMN REINFORCEMENT WORK
PILE CAP WORK FLOOR WORK
EXCAVATION WORK FOR FILLING THE RSPTN AREA
CLOSING OF RETAINING WALL BASEMENT CONNECTING FORMWORK
RSPTN PILE CAP CASTING
LIFT AREA CLEANING WORK RSPTN
LIFT AREA CLEANING WORK RSPTN
TOWER CRANE PERMIT LOAD TEST
TOWER CRANE END LOAD TEST 1.3 TONS LIFTED SAFELY
PROGRESS OF STRENGTHENING FORMWORK RET WALL RSPTN
RSPTN 80 M3 RETAINING WALL CASTING PACKAGE (K400)
CHECK THE CASTING RESULTS OF THE RSPTN RETAINING WALL
RSPTN PIT LIFT COLUMN CASTING PACK
RSPTN PILE CAP CASTING
CHECK THE VERTICALITY OF THE RSPTN PITLIFT COLUMN