LOBBY AREA IRC SLAB AND BEAM CASTING WORK
LOBBY AREA IRC SLAB AND BEAM CASTING WORK
PROGRESS OF IRONING AND STRENGTHENING THE FORMWORK FOR THE IRC EMERGENCY STAIRS AT THE BASE OF ZONE 3
LIGHT MASONRY WORK IN BATHROOM AREA FLOOR 01 IRC
PROGRESS OF IRONING AND STRENGTHENING THE FORMWORK FOR THE EMERGENCY STAIRS AT THE BASE OF IRC ZONE 3
IRC MEZZANINE LT AREA ACTIVITIES
IRC MEZZANINE LT AREA ACTIVITIES
IRC ROOF STEEL FRAME ERECTION PROCESS (ZONE 1)
IRC ZONE 1 ROOF STEEL FRAME ERECTION PROGRESS
LIGHTING WIRING CABLES & SOCKETS ON THE 1ST FLOOR OF THE IRC BUILDING (MATERIAL: VOXEL 3X2.5) TECHNICIAN : 2
PROGRESS OF REPAIRING IRC GROUND FLOOR EMERGENCY STAIRS ( ZONE 1 )
PROGRESS OF REPAIRING IRC GROUND FLOOR EMERGENCY STAIRS ( ZONE 1 )
IRC ZONE 1 ROOF STEEL FRAME ERECTION PROGRESS
PROGRESS OF WIREMESH INSTALLATION AREA LT MEZZANINE IRC ( ZONE 3 )
SPRAYING THE IRC ZONE 1 MEZZANINE FLOOR AREA WITH AN AIR COMPRESSOR ( STAGE 1 )
HYDRANT & SPRINKLER PIPING (MATERIAL : BLACKSTEL, SPINDO)
MONITORING TOGETHER WITH CHECKING THE IRC CANOPY AND IRC FACADE
MONITORING TOGETHER WITH CHECKING THE IRC CANOPY AND IRC FACADE
MONITORING TOGETHER WITH CHECKING THE IRC CANOPY AND IRC FACADE
FINISH CASTING OF IRC 2 UNIT CANOPY COLUMNS
CASTING WORKS LT MEZZANINE IRC ( ZONE 1 ) K350
CASTING WORKS LT MEZZANINE IRC ( ZONE 1 ) K350
CASTING OF THE MEZZANINE FLOOR PLATE OF THE IRC ZONE 3 BUILDING
IRC ZONE 1 ROOF STEEL FRAME ERECTION PROGRESS
ERECTION OF IRC ZONE 3 ROOF STEEL FRAME
ERECTION OF IRC ZONE 3 ROOF STEEL FRAME
ERECTION OF IRC ZONE 3 ROOF STEEL FRAME
MONITORING PROGRESS OF IRC DEVELOPMENT
IRC ROOF STEEL FRAME ERECTION PROGRESS (ZONE 3)
CHECKLIST WITH MK AND CONTRACTORS, 3RD FLOOR IRC (TRIBUNE AREA)
CHECKLIST WITH MK AND CONTRACTORS, 3RD FLOOR IRC (TRIBUNE AREA)
MONITORING THE INSTALLATION OF IRC LIGHT BRICKS ON FLOOR 03 IN THE TOILET AREA
MONITORING THE INSTALLATION OF IRC LIGHT BRICKS ON FLOOR 03 IN THE TOILET AREA
INSTALLATION OF LIGHT BRICKS RSPTN FLOOR 1 LAB AREA
WIRING CABLE FOR LIGHTING & SOCKETS ON THE 1ST FLOOR OF THE IRC BUILDING (MATERIAL: VOKSEL 3 X 2.5)
HYDRANT & SPRINKLER PIPING INSTALLATION IN SHAFT AREA ZONE A OF IRC BUILDING (PIPE MATERIAL: BLACKSTELL 4” SPINDO, WIRE: RB-26)
IRC MEZZANINE FLOOR FORMWORK INSTALLATION (ZONE 3)
DISMANTLING OF FORMWORK IN IRC MEZZANINE LT AREA
IRC INNER SIDE STAIRS LIGHT BRICK WORK (FLOOR 02 GRID A)
LIGHT BRICK WORK 3RD FLOOR IRC LECTURE ROOM AREA
LIGHT BRICK INSTALLATION OF COMMITTEE ROOM FLOOR 03 IRC
PLASTERING WORK ON FLOOR 02 TOOL ROOM IRC C4
LIGHTING CABLE WIRING & SOCKETS ON THE 1ST FLOOR OF THE IRC BUILDING
WIRING CABLE FIRE ALARM & SOUND SYSTEM 1ST FLOOR OF THE IRC BUILDING